Aznalcollar |
||
Solar Farm in Aznalcollar (Sevilla) |
||
| , Spain | ||
|
|
|
|
Don Benito |
||
Solar farm in Don Benito (Badajoz) |
||
| , Don Benito Spain | ||
|
|
|
El Viso |
||
Solar Farm in El Viso (Córdoba) |
||
| , Spain | ||
|
|
|
|
Foggia |
||
2 MW PV plant in South of Italy |
||
Ecostream provided executive design, all materials supply, and installation of technical components, up to the acceptance test. In order to check the PV system’s performances, Ecostream offers full service for plant maintenance, also thanks to the supply and implementation of a monitoring system. |
||
| San Marco in Lamis, Foggia Italy | ||
|
|
|
Froschham, Bavaria |
||
Solar Park Froschham |
||
|
In 2008 Ecostream built the first thin film solar park in Germany. One important requirement in this major project was the reliable supply of new modules by our partner First Solar. |
||
| Renewagy A/S, Froschham Germany | ||
|
|
|
Heerhugowaard |
||
Ecostream produces 350 kWp in Stad van de Zon (Sun City) |
||
Ecostream BV has realized the turnkey delivery and installation of 350 kWp of photovoltaic systems for Bouwfonds Property Development in a district of Heerhugowaard called "Stad van de Zon". Each year these systems produce a total of 280,000 kWh of solar energy. Eye-catchersOne of the eye-catchers is the system on the Prisma houses: a screen of galvanised steel, with six solar panels for each house. These panels, which were specially manufactured for this project, consist of two layers of glass, between which the solar cells are laminated. All cables are concealed within the construction, giving it a clean, attractive look. ConSolesFurthermore, Ecostream has delivered and installed large numbers of solar panels on houses with flat roofs. These panels are placed on so-called ConSoles, a ballasted synthetic supporting framework, which stands freely placed on the roof without damaging it. All the phases in the project were carried out by Ecostream: from initial engineering through to delivery of an operational solar energy system. |
||
| Bouwfonds, Heerhugowaard Netherlands | ||
|
|
|
Heretsried |
||
Solar Park Heretsried |
||
The Solar Park Heretsried in the district of Augsburg joined the grid in December 2006. Ecostream Germany GmbH played a leading role in setting up the solar park on the 68,000 square metre site. |
||
| Solar Park, Heretsried Germany | ||
|
|
|
Hornachuelos |
||
Solar Farm in Hornachuelos (Córdoba) |
||
| , Spain | ||
|
|
|
Huelva |
||
Three PV Solar plants in Huelva with a total of 2,1 MW |
||
| Huelva, Spain | ||
|
|
|
Moorenweis |
||
Solarpark Moorenweis |
||
After a positive referendum in the community of Moorenweis in Bavaria, Ecostream started with the construction of the 6MW solar park in September 2007. As planned, the main part was grid-connected in December 2007. Moorenweis is the largest project which Ecostream Germany has realised up to now. |
||
| Gemeinde Moorenweis, Moorenweis Germany | ||
|
|
|
Murcia |
||
PV Solar Plant 12,7 MW in Murcia |
||
| Murcia, Spain | ||
|
|
|
|
OCMW Maldegem |
||
117 kWp system on the roof of a home for the Elderly in Maldegem |
||
| Ecostream installed over 600 solar panels on the roof of the home for the elderly "Warmhof" in Maldegem. Thanks to this system, Warmhof can provide 50% of it's own energy! | ||
| OCMW Maldegem, Maldegem Belgium | ||
|
|
|
Palencia de Negrilla |
||
Solar Farm in Palencia de Negrilla (Salamanca) |
||
| , Spain | ||
|
|
|
|
Progrez |
||
Woonstichting Progrez, a housing association in Dordrecht |
||
Approximately 3,000 solar panels with a surface area of 4,000 m2 have been installed at seven locations in Zwijndrecht and Dordrecht. With maximum sunlight this project generates 500 kW, providing electricity for about 100 households. To make optimum use of subsidies, the project was carried in an extremely short time; the preparation, design and execution phases together took no more than 13 weeks. Ecostream was responsible for:
|
||
| Woonstichting Progrez, Dordrecht Netherlands | ||
|
|
|